The waste chute is a vertical pipe that runs the entire height of the building, designed to transport waste from each floor’s disposal opening (collection door) to the central waste room on the ground floor. This ensures a smooth and safe flow of waste.
It is also used to connect the pipes for the garbage chute and laundry chute, adhering to the highest standards of efficiency and sustainability.
Related Products

Fire Sprinkler System
$0.00
Fire sprinklers are installed within the chute on every floor, designed to detect and respond rapidly to fire hazards, ...

Intake Door
$0.00
The Bottom/Side hanged door, located in the service room on each floor, is designed for seamless waste disposal. It al ...

Fire Rated Linen Intake Door
• Hand Operated Side Hinged 2 Hr Fire Rated by National Research Centre listed. Noiseless Self-Closing Intake Hopper Doo ...

Fire Rated Garbage Intake Door
• Hand Operated Bottom Hinged 2 Hr Fire Rated by National Research Centre listed.
• Noiseless Self-closing Intake Hop ...

Cleaning Sprinkler
$0.00
The cleaning spray head is installed inside the chute, positioned above the upper sliding door. It is designed for eas ...

Disinfection Unit
$0.00
The disinfection and sterilization unit is installed at the top of the garbage chute, where the cleaning sprayers effe ...

Garbage Collection Bin
$0.00
Constructed from high-quality HDPE material with UV resistance, this bin offers exceptional strength, superior durabil ...

Linen Discharge Door
The linen discharge is set at the bottom of linen chutes to allow exiting of laundry. The door is held open by springs a ...

Fire Door
$0.00
Our system is designed to meet the highest global safety standards. It is equipped with a UL-certified thermal fuse th ...

Maintenance Inspection Door
$0.00
Positioned below the ventilation pipe on the top floor, the maintenance inspection door allows for easy entry during s ...

Elbow
$0.00
The deflection angle must be at least 15 degrees from the horizontal to enhance durability and minimize impact when ba ...

Intake Throat
$0.00
Each floor is equipped with an entry opening that supports the installation of an intake door, ensuring ease of use an ...

Control Panel
$0.00The GSCS electrical control panel provides seamless management of chute systems, including the operation of intake doors ...

Ventilation Section
$0.00
A specially designed ventilation unit extends from the chute, featuring a canopy to facilitate airflow and prevent odo ...

Cleaning Sprinkler
$0.00
The cleaning spray head is installed inside the chute, positioned above the upper sliding door. It is designed for eas ...